Powered By Kitlog Pro v2.0
Marks Web Site
RV-7A
Fuselage
6-12-2007
< Previous Log Entry
Next Log Entry >
Date:
6-12-2007
Number of Hours:
1.50
Manual Reference:
8-5
Brief Description:
Match drill J-channel to aft fuselage assembly
Today I turned over the aft fuselage assembly, placed and leveled it on saw horses and match drilled the J-channels to the side skins.
Aft fuselage Assembly
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
606
2383
Empennage
59
221
Engine
2
7
Firewall Forward
71
326
Fuselage
260
1134
Instrument Panel
25
102
Miscellaneous
46
158
Shop Supplies
1
2
Wings
142
433
Copyright © 2001-2024 Matronics. All Rights Reserved.